Bunkering checklist

Bunkering without claims: a checklist for masters

Most bunker claims are lost on evidence. Tick through these steps on board, keep the record sheet, and the facts will be on the ship's side.

Bunkering checklist for masters

Before, during and after delivery: the steps that prevent quantity and quality claims, and the evidence to keep.

1. Before the barge arrives

2. On the barge, before pumping (a ship's officer attends)

3. During delivery

4. After delivery

5. If something is wrong

6. Record sheet

Vessel: ______________________   IMO: ____________   Port: ______________   Date: __________
Barge: ______________________   Grade: ______________   BDN no.: ______________

Ship's tanks

TankOpening sounding / ullageOpening temp. °CClosing sounding / ullageClosing temp. °CVolume at 15°C (m³)
      
      
      
      
      
      

Barge's tanks

TankOpening sounding / ullageOpening temp. °CClosing sounding / ullageClosing temp. °CVolume at 15°C (m³)
      
      
      
      

Mass flow meter reading: opening __________ closing __________   Seals intact: yes / no
Hose connected: ______   Pumping started: ______   Stopped: ______   Hose disconnected: ______
MARPOL sample seal no.: ______________   Other sample seals: ____________________________________
Quantity by ship's figures: ______ t   Barge's figures: ______ t   Difference: ______ t   Letter of protest issued: yes / no

A reminder of good practice, not legal advice. It does not replace the ship's safety management system, the supplier's procedures or local port regulations.

Sources

  • IMO, MSC-MEPC.2/Circ.18 (2024), Guidelines for the sampling of fuel oil for determination of compliance with MARPOL Annex VI and SOLAS chapter II-2
  • MARPOL Annex VI, regulation 18 and appendix V (bunker delivery note); SOLAS regulation II-2/4.2.1 (flashpoint)
  • P&I club guidance on bunker quantity disputes and "cappuccino" bunkers (Britannia, West, UK Defence Club)
  • BIMCO Bunker Terms 2018, clause 9 (claims); ISO 8217 and ISO 4259 (test precision)
  • MPA Singapore, Port of Rotterdam and Port of Antwerp-Bruges (mass flow meters)

Need to work out a quantity? Use our bunker calculator (ASTM Table 54B).

A problem with a delivery?

Tell us what happened: we help our clients with protests, surveyors and claims.

Request a quote